COMPLETED IMPACTS
Children's Home Big Move-In @ JCM Nicaragua
From 2020-2022, together we raised $50,000 to come alongside JCM Nicaragua to finally finish their Children's Home. A 7-year long stalled project.
Phase 1 Solar @ KBC School Nicaragua
In March 2022, together we began installing solar power at KBC School in Nicaragua. This starter system was enough to power the well for the school.
School Renovation @ CEPAD Nicaragua
In Jan-Feb 2021, together we renovated a local Christian school where children were getting wet during the rains, and overheated during the dry season. No longer the case...
Solar Phase 1 +2 @ Campo Sagrado Farm
In 2021, together we added solar power to the Campo Sagrado Farm, a farm providing thousands of meals each week to children in poverty.
Solar Phase 1 @ JCM Childrens Home
In June 2022, Solar Phase 1 @ JCM Nica Children's Home was completed. Six solar panels and 4 batteries.
Water Filtration @ CEPAD School
In 2021, during renovation of the school, we custom fabricated a Filter of Hope water drinking station for the 150 students that attend the school.
Water Filtration @ JCM Nica Children's Home
In 2022, we built a water tower and added a sediment, charcoal, and UV water filtration system for all the new homes' water needs.
Water Filtration @ KBC School
In 2021, together we added a sediment, charcoal, and UV water filtration system to the KBC School water tower that supplies drinking water.
Water Therapy Pool @ JCM Nica Children's Home
In June 2022, the therapy pool for children in need at the JCM Nica home was completed.
Well Restoration @ Tomas Borge Community, Nicaragua
In 2021, together we repaired two wells in the Tomas Borge community.